Teacup Cabin and Toilet Improvements

A new roof was constucted that properly covers both of the pit toilets. Although there was a roof over one of the pit toilets it was showing wear and tear. Removing the old roof and adding a new structure that covered both loos was the best solution.

The stove was moved to a more central spot in the cabin so the stove pipe could be at a more central location in the roof so as to reduce wear and tear from roof snow. This location should have the added benefit of heating the entire cabin quickly and provide a nice place to gather and chat. The cabin floor was also repainted and new base boards added for a proper finishing touch. The cabin has never looked better.

Thanks go out to board members John Betonte and Stephen Schnieder for managing these projects and making sure they got done.

  • New loo roof!  » Click to zoom ->

    New loo roof!

  • New loo roof  » Click to zoom ->

    New loo roof

  • New location for stove and pipe  » Click to zoom ->

    New location for stove and pipe

  • New stove pipe  » Click to zoom ->

    New stove pipe

  • Stove now centrally located  » Click to zoom ->

    Stove now centrally located

  • Stove from the back  » Click to zoom ->

    Stove from the back

Follow Teacup Nordic on Twitter